Richmond Hill Zoning Bylaw: Which Rules Apply to Your Home
Richmond Hill zoning bylaw guide: why By-law 93-25 is under appeal, which older by-law may still govern your lot, additional unit limits and who to ask.
The Richmond Hill zoning bylaw that governs your lot depends on one fact: Comprehensive Zoning By-law 93-25 was adopted in September 2025, but the whole by-law is under appeal at the Ontario Land Tribunal, so older by-laws such as 313-96 can still apply to your property. Confirm which one covers you with the City before you design anything.
Planning more space? Our home additions in Richmond Hill start with this same zoning check, because setbacks, height and coverage decide what the design can be.
Why does Richmond Hill have more than one zoning by-law?
Richmond Hill is replacing dozens of older zoning by-laws with one. The City's office consolidation of By-law 93-25 says council adopted it on September 24, 2025 and that the entire by-law is under appeal before the Ontario Land Tribunal as of April 22, 2026.
Section 1.14 of 93-25 says the former by-laws, including 313-96 and about thirty others, are repealed only when 93-25 comes into full force and effect on a given piece of land. While the appeal runs, the answer for your lot can be the old by-law, the new one, or a mix, so never assume. The consolidation is also labelled a convenience copy that is not a legal document, and the certified version sits with the City Clerk.
How do I find out which zoning by-law applies to my lot?
Ask the City in writing. The Request for Zoning By-law Information form is free, and the City says to allow up to 5 business days for an answer. The Building Services page adds that zoning information is not given by phone or in person at this time.
Send the property address, your question and the work you plan. Ask three things: which by-law and zone apply, which limits matter for your project, and whether any minor variance has already been granted on the lot. The City's consolidation says approvals granted between April 5, 2012 and passage of 93-25 can modify the new by-law for that land, so earlier variances matter.
| Question | Who to ask |
|---|---|
| Which zoning by-law and zone applies to my lot | Zoning information form, reply within 5 business days |
| Does my project need a permit, forms, drawings | Building Division, [email protected] |
| Minor variance hearing dates and requirements | Committee of Adjustment, [email protected] |
| Suspected unpermitted unit | [email protected] |
| Electrical permit for a new unit | Electrical Safety Authority, separate permit |
What does the Richmond Hill zoning bylaw allow for additional units?
Richmond Hill allows up to three additional residential units per lot, with no more than four dwelling units in total, and no more than two of the additional units in a detached building. The City's additional residential unit page says By-law 143-24 was passed on December 11, 2024, and section 3.18 of By-law 93-25 repeats the same count.
The lot must have frontage and direct vehicle access to a street (or be tied land or in a common element condominium), and be serviced by municipal sewers and water. Zoning also shuts the door in some places: By-law 143-24 lists floodplain, low land, open space, environmental protection and Oak Ridges Moraine natural areas where no additional units are allowed. A unit cannot be reached only through a garage.
| Item | Limit |
|---|---|
| Detached buildings per lot | 1, in the rear yard only |
| Side yard and rear yard setback | At least 1.2 m each |
| Gap from the house (main wall to main wall) | At least 4.0 m |
| Height | 2 storeys, 7.5 m to the roof peak, main walls 6.0 m |
| Building coverage, including any integral garage | 80 square metres at most |
| Rear yard soft landscaping | At least 50% |
| Path to the unit door from the street | At least 1.0 m wide, 2.1 m clear overhead, hard surface |
| Rooftop amenity area | Not permitted |
One quirk shows up in the numbers: soft landscaping in this by-law does not include driveways, patios, walkways, interlocking stone or permeable pavement, so a yard that feels green can still miss the 50% mark. Count only ground that grows plants and drains water.
Parking is set by area in 143-24, Table 1. For a lot with three additional units, the minimum total (including the main house) is 0 spaces in Area 1, 1 in Area 2, 2 in Area 3 and 3 in Area 4, with exceptions for narrow lots. Check which area your lot is in before you plan the driveway. Our accessory dwelling units in Richmond Hill page covers the build, and garden suite vs laneway home explains how a detached unit differs from a laneway house.
What if my design breaks a zoning limit?
You can ask the Committee of Adjustment for a minor variance. The City's Committee of Adjustment FAQ says a request must pass four Planning Act tests: it meets the intent of the Official Plan, meets the intent of the by-law, is desirable for the development of the land, and is minor. It also says a minor variance typically takes 2 to 3 months from application to hearing.
Neighbours are told. The City mails notice to owners within 120 metres at least 14 days before the hearing, posts a sign on the property and posts the notice online. Hearings are in person on Thursday evenings at 7 p.m. in Council Chambers, and members of the committee will likely visit the property in the week before.
The checklist the City asks for is practical: a metric sketch or survey with setbacks, elevations of each side with new construction, and an arborist report if trees stand within six metres of the work. Applying before you finalize permit drawings avoids drawing the same house twice. Toronto runs a similar process, explained in our post on the Committee of Adjustment and minor variances in Toronto.
Do I need a Richmond Hill building permit after the zoning check?
Almost always, yes. The City's building permit FAQ says you need a permit to construct or demolish any building or addition, including alterations, decks and sunrooms. A detached accessory building of 10 square metres or less without plumbing does not need one, and neither do painting, cupboard installation, landscaping or basement damp-proofing.
For a new unit the City's list includes the application form, the designer information form, the applicable law compliance form, a site plan agreement where site plan control applies, a site alteration permit for a new accessory building over 400 square feet, conservation authority approval in regulated areas, and drawings sealed by an architect, engineer or qualified designer. The City also offers a pre-approved detached unit plan of about 6.64 by 5.47 metres, which still needs a site-specific site plan.
Plan for the order of work. The City states that inspections are requested at each stage and that an occupancy permit follows only after all inspections pass. It also says an application that is incomplete or inactive for six months is considered abandoned. Our Markham building permit guide shows how a neighbouring city publishes its own review times, and when a GTA renovation needs a permit covers the wider question.
What does the by-law change mean if I already applied?
Section 1.12.5 of 93-25 says a complete building permit application filed between April 5, 2012 and the day before 93-25 was passed is protected if the project complies with the zoning by-laws in force the day before. Section 1.12.8 ends these transition provisions three years after council passed the by-law.
Filing a complete application with a design that complies is therefore the safest way to lock in the rules you designed to. A project that sits in the gap, filed late or needing a variance, should be checked against both by-laws, since the answer on your land may depend on how the appeal ends.
What should you have ready before you call?
- your survey and the property address for the zoning information form;
- the work you plan: addition size, storeys, a detached unit, or a basement suite;
- whether the lot is near a creek or valley (the TRCA can regulate it, and the City lists its approval where it applies);
- whether you hold any earlier variance or approval for the lot;
- who will prepare sealed drawings.
If you want a team to read the by-laws, draw the plans and handle the permit file with you, send your survey and a short description through our contact page and ask for a written quote. Our permit and zoning page explains how we approach this step, and the home renovations in Richmond Hill page lists what we build there. For a larger project, a home addition in Richmond Hill is the usual starting point.
Frequently asked questions
Is Richmond Hill's new zoning by-law in force?
Not in full. Council adopted Comprehensive Zoning By-law 93-25 on September 24, 2025, but the City's April 22, 2026 consolidation says the entire by-law is under appeal at the Ontario Land Tribunal. Older by-laws are only repealed on lands where 93-25 comes into full force, so confirm which one covers your lot.
How do I find out which zoning by-law applies to my Richmond Hill lot?
Use the City's online Request for Zoning By-law Information form. The City says there is no fee and to allow up to 5 business days for a reply. It also states that it does not give zoning information by phone or in person at this time.
How many additional units can I have on a Richmond Hill lot?
By-law 143-24 and section 3.18 of By-law 93-25 allow up to 3 additional residential units on a lot, with no more than 4 dwelling units in total and no more than 2 of the additional units in a detached building. The lot must be serviced by municipal water and sewers, and some zones, such as floodplain and natural core areas, do not allow them.
Do I need a minor variance if my design breaks a zoning limit?
Yes, unless the design is changed to comply. The Committee of Adjustment decides minor variances against four Planning Act tests, and the City says an application typically takes 2 to 3 months from submission to hearing. Plan that time before you set a construction start date.
Can a Richmond Hill building permit be issued before zoning is settled?
No. The City says Building Division staff check that plans meet the Zoning By-law, the Ontario Building Code and related standards, so zoning questions come first. A design that needs a variance waits for the Committee of Adjustment decision before the permit can proceed.
Is a small backyard shed covered by the Richmond Hill zoning bylaw?
Yes. The City says a detached accessory building of 10 square metres or less with no plumbing does not need a building permit, but it also says zoning by-laws still apply when no permit is required. Setbacks and lot coverage limits still govern where it can go.