One accountable team
Our in-house design team, permits, and build crew work under one roof, so design intent carries straight through to the finished space.
Planning a basement apartment in Brampton starts with registration, zoning and the Ontario Building Code.
Tell us about your project and our team will be in touch. Free, no-obligation consultation and site visit with our design team.
Our in-house design team, permits, and build crew work under one roof, so design intent carries straight through to the finished space.
Quality materials and proven detailing chosen for how you live, finished to the Ontario Building Code and built to hold up for the long run.
The price we quote is the price you pay. We scope the work properly before we start, so there are no lowball bids that balloon into surprise change orders later.
Design, permits, and construction handled in accordance with Ontario requirements and your municipality.
Andare did an amazing job renovating my house, they turned an old and boring basement into a modern and exciting place. Their attention to detail was astounding and I couldn't be happier with the results.
Our basement went from an unfinished storage space to a fully functional family room. Amazing transformation, 5 stars, 100% recommend.
Fantastic experience with them! The team was professional, attentive, and delivered high-quality work on time and within budget. Highly recommend for anyone building or renovating their home!
Andare took our outdated house and turned it into a modern, functional space. The new addition blends seamlessly with the existing structure.
The attention to detail is incredible. The Andare team has just finished building my home and I'm absolutely blown away. I've been living in here for just under a month now and I still haven't found a single flaw, you can really see their experience and craftsmanship in every part of the home.
Andare delivered excellent quality and great service. The team was professional and made everything easy.
A legal basement apartment in Brampton is a registered additional residential unit, built to the Ontario Building Code and the City's Zoning By-law. The City of Brampton calls a self-contained unit inside a house an attached additional residential unit (ARU), and says it can be in any part of the dwelling, including the basement. Below is how the rules work for a homeowner planning one, taken from the City's own pages and the Ontario Building Code.
Second and third units are permitted in detached, semi-detached and townhouse dwellings, subject to zoning. Brampton's Zoning By-law does not allow ARUs in lodging houses, supportive housing residences, floodplain areas or open space zones. Since May 2023 a property can have a maximum of three units including the main dwelling: either the principal dwelling with one attached second unit and one garden suite, or the principal dwelling with an attached second unit and an attached third unit.
If a design cannot meet the By-law, the City points owners to the Committee of Adjustment for a minor variance.
To be legal, every ARU must be registered with the City, including units previously treated as legal non-conforming and units that only family members will use. Registration is a one-time process that confirms the unit meets the Building Code and Zoning By-law. Registering is not the last step: the City states that owners cannot rent or allow a unit to be occupied until a Residential Rental Licence is obtained, and that licence applications and renewals are free.
Unregistered units can face enforcement and insurance consequences, and the City lists significant fines under the Planning Act, Building Code Act and Municipal Act, with daily penalties for continuing offences. Brampton also requires building renovators, plumbing contractors and HVAC contractors to hold a City of Brampton licence before they work on any ARU.
Brampton reviews a basement apartment against the Ontario Building Code. These are the main life-safety requirements in the 2024 Building Code compendium published by the Province.
Article 9.10.9.16 requires suites in a residential occupancy to be separated from adjacent rooms and suites by a fire separation with a fire-resistance rating of at least 45 minutes. For a house with a secondary suite, the walls and floor-ceiling framing between the units, and between the units and common or ancillary spaces, may instead be protected by a continuous smoke-tight barrier of at least 15.9 mm Type X gypsum board on both sides of the walls and the underside of the floor framing.
That rating can be waived if the house is sprinklered. This is why a basement ceiling is usually opened up or rebuilt, and why penetrations for ducts, pipes and wiring must be sealed correctly.
Brampton asks for drawings that show which egress option applies to the unit. Under Article 9.9.10.1, every floor level that contains a bedroom must have at least one outside window that opens from the inside without tools, with an unobstructed opening of at least 0.35 square metres and no dimension under 380 mm.
If the window opens into a window well, the Code requires at least 550 mm of clearance in front of it, and any protective cover must open from the inside without keys or tools. Brampton also notes that a new below-grade entrance or stair requires an engineer or a qualified designer.
Article 9.10.19 requires smoke alarms in each dwelling unit, with at least one on every storey including the basement, one in each sleeping room, and one between the sleeping rooms and the rest of the storey.
In a house with a secondary suite, alarms are also required in shared exits and common areas, and they must be interconnected, wirelessly or by wiring, so that any one alarm sounds every alarm in the house. Alarms carry a visual signalling component and are permanently wired with a battery backup.
Section 9.8 of the Ontario Fire Code (O. Reg. 213/07) applies to houses that already contained two units on July 14, 1994. It asks for a 30-minute fire separation between units, or a 15-minute separation with interconnected smoke alarms, and sets rules for the means of escape from each unit. Retrofit questions for an older basement apartment turn on that date, so confirm which set of rules applies to your house.
The Electrical Safety Authority advises hiring a Licensed Electrical Contractor, who files the notification of work and provides a Certificate of Acceptance when the work is finished. Brampton's application also requires a water pipe sizing data sheet for two dwelling units, and where the water service must be upgraded, a connection request goes to the Region of Peel.
The City also forwards ARU permit information to the Municipal Property Assessment Corporation, which can revise the assessment, and it recommends telling your insurer before you build.
Planning basement apartment in Brampton? Talk it through with our in-house design team.
Brampton homes range from older village-core streets to large subdivisions and newer growth areas, and many households here are multi-generational. A basement apartment has to work for the people who will live in it: a dry, bright lower level, an entrance that suits the lot, separate laundry and storage where the plan allows, and a layout that places the bedroom window where the Code needs it.
Andare's in-house design team prepares the layout and coordinates the drawing package the City asks for, and all of our trades are licensed and insured. We work in Springdale, Castlemore, Credit Valley, Mount Pleasant, Heart Lake, Snelgrove, Sandalwood, Fletcher's Meadow and nearby Brampton communities.
If the basement is not ready for a suite, basement renovations in Brampton and basement underpinning in Brampton can raise ceiling height or fix moisture first. For other ways to add a unit, see in-law suites in Brampton, accessory dwelling units in Brampton and our legal basement apartment overview. Our Brampton home renovation page lists everything we build in the city.
The rules and facts on this page come from these official pages. Rules change, so confirm the current version with the municipality before you apply.
Yes, when it is a registered additional residential unit. Brampton permits second units in detached, semi-detached and townhouse dwellings, subject to zoning, and the City states that every unit must be registered to be legal. Registration confirms the unit meets the Ontario Building Code and the Zoning By-law.
Yes. The City states that all additional residential units must be registered regardless of who lives in them, so that the unit is safe and emergency crews know it is there.
Not for one unit. The Zoning By-law does not require an additional parking space on a lot with one ARU. A lot with more than one ARU needs a space for each unit, located on the property and not on the street or boulevard.
The main requirements are a fire separation between the units (45 minutes, or a smoke-tight Type X gypsum board barrier in a house with a secondary suite), interconnected smoke alarms throughout the house, and an openable egress window in every bedroom with at least 0.35 square metres of clear opening. Your designer confirms the exact assemblies for your house.
Only after you hold a Residential Rental Licence. The City states that registered units cannot be rented or occupied until the licence is obtained, and that the licence is free.
Brampton requires building renovators, plumbing contractors and HVAC contractors working on an ARU to be licensed by the City, and electrical work should be done by a Licensed Electrical Contractor. All of our trades are licensed and insured. The City also suggests telling your insurance company before you build.
The City says an owner can apply to the Committee of Adjustment for a minor variance. Properties in Credit Valley Conservation or Toronto and Region Conservation Authority regulated areas need that authority's sign-off before a permit can proceed.
Still have a question about basement apartment in Brampton? Ask our in-house design team directly.
Design-build services across Brampton. See all services in Brampton →
We design and build across the GTA. Explore the areas next to Brampton.
Custom homes, additions, renovations, and multiplexes, designed and built for homeowners, architects, designers, and engineers.
Tell us about the Brampton property and what you want the lower level to do. Andare's in-house design team will walk through registration, zoning and the Building Code requirements for your house; call (416) 524-1165.
Backed by our workmanship warranty, we stand behind every job · Licensed, Insured and WSIB-Covered
Tell us about your project and our team will be in touch. Free, no-obligation consultation and site visit with our design team.
Andare Homes provides basement apartment, designed and built by one accountable team across the GTA.
Three fields. Our design team replies with the next step.
Thanks, we will call you shortly.
Press Esc to close
Elena
Design Consultant