Basement Underpinning Permits in Toronto, 2017 to 2025

Our analysis of City of Toronto permit data counts 1,527 underpinning permits issued from 2017 to 2025 and shows where they cluster and what they add.

Our analysis of City of Toronto building permit data shows 1,527 building permits that mention underpinning were issued from 2017 to 2025. The yearly count more than doubled, from 128 permits in 2017 to 267 in 2025. About two in five of the permits sit in just ten postal areas, and nearly two thirds are for detached or semi-detached houses.

For a homeowner, those numbers say lowering a basement is now a common, well-travelled path in Toronto. They do not say your house is a good candidate. This post explains what the permit records show, how we counted, and what to take from them if you are planning basement underpinning. If the aim is a second unit, our checklist of legal basement requirements in Ontario shows the ceiling height the lowered floor has to reach.

How many underpinning permits does Toronto issue each year?

The count has grown in most years, with a dip in 2020 and a sharp rise in 2025. In 2025 the City issued 267 building permits that mention underpinning, 2.09 times the 128 issued in 2017 and 80 more than in 2024, an increase of 42.8 per cent in one year.

Building permits mentioning underpinning, issued in Toronto by year, 2017 to 2025. Source: our analysis of City of Toronto building permit data (active and cleared permits), downloaded October 27, 2026.
Year issuedPermitsAlso create a dwelling unitAlso mention an addition or storey
2017128535
2018140848
20191411945
20201141145
20211641364
20222052294
20231812378
20241873272
202526743113
Total1,527176594

The 2020 dip and the 2025 jump are the two moves worth noticing. We cannot say from permit records alone what drove either one, so we do not guess. What the table does support is that demand for deeper basements is not a short fashion: every year from 2021 onward is above every year from 2017 to 2020.

Where in Toronto are underpinning permits concentrated?

Underpinning permits spread across 84 three-character postal areas, but they cluster. The ten busiest postal areas account for 652 of the 1,527 permits, or 42.7 per cent. The top three are M6J with 83 permits, M6H with 71 and M4L with 69.

The pattern fits what the housing stock would suggest. Older, narrow, low-ceilinged houses in the central and west-central parts of the city are the ones where an owner gains the most from lowering the floor. That is an inference from where the permits sit, not something the data states.

If you live outside the busiest areas, that is no warning sign. A foundation, not a postal code, decides whether underpinning is practical. Our page on basement underpinning in Toronto covers how the process works on city lots.

What kinds of houses get underpinned?

Detached and semi-detached houses account for 982 of the 1,527 permits, or 64.3 per cent: 653 detached and 329 semi-detached. Two-unit detached houses (116), multiple unit buildings (116) and two-unit semi-detached houses (83) come next.

The semi-detached share matters for planning. A semi shares a party wall and often a footing line with its neighbour, and the City’s guide treats work below an adjacent footing as a trigger for engineering. Our cost guide to basement underpinning in Toronto explains how shared walls change the sequence and the pricing conversation.

Are underpinning permits becoming part of bigger projects?

Yes, in two ways. First, permits that also create a dwelling unit have risen from 5 in 2017 to 43 in 2025. That is 3.9 per cent of the permits in 2017 and 16.1 per cent in 2025, and 176 across the whole period, or 11.5 per cent. Lowering the floor to reach a livable ceiling height is a common first step before a suite, which is the subject of our page on legal basement apartments.

Second, 594 of the permits, or 38.9 per cent, also mention an addition or a storey in the description. The share was 27.3 per cent in 2017 and 42.3 per cent in 2025. Owners increasingly settle the foundation, the new floor above it and the layout in one permit instead of three. If you are weighing that sequence, our guides to home additions and multiplex conversions show how the pieces fit together.

What does the data mean for your own project?

Three practical points come out of the numbers.

  • Lowering a basement is a routine permit. The City issues well over a hundred of these permits a year, so the process is established. That does not make it fast, and the data is silent on timing.
  • Underpinning is often one part of a larger plan. More than one in three of these permits also mention an addition or a storey. Decide the whole scope before you draw only the foundation.
  • The permit is the easy part to find and the engineering is the hard part to price. The City sets the engineering and drawing requirements, so plan for them early.

The City of Toronto’s residential underpinning guide, last modified August 18, 2026, says a Professional Engineer must design and review on site a foundation built below an adjacent building’s footing and within the soil’s angle of repose. It also calls for a Professional Engineer’s design and field review where underpinning exceeds 1200 millimetres of laterally unsupported height, or where the soil is clay or silt. Drawings must show the proposed underpinning, numbered construction stages and the lineal metres of work.

What should you have ready before calling a contractor?

Gathering a few things first shortens the first conversation and sharpens the plan:

  • The house type (detached, semi-detached or row) and which walls are shared.
  • The ceiling height you want, and any floor-level goal such as a legal suite.
  • Whether you plan an addition, a second storey or a suite, since these change the structural plan.
  • Any earlier drawings, survey, permit history or notes about past water in the basement.
  • A realistic window for living elsewhere, because underpinning is noisy and dusty.

Bring the questions, and we will explain how the structural sequence, drainage and finishes fit together. For related structural work, see our structural renovations page, and for what happens after the foundation is done, our basement renovations page.

How we counted

We used two City of Toronto data sets, both published by Toronto Building: Building Permits - Cleared Permits and Building Permits - Active Permits. We downloaded both on October 27, 2026 and combined them.

  • Which permits. Permits whose written DESCRIPTION contains the word “underpin” (any capitalization), and whose permit number ends in BLD, the main building permit. Companion mechanical, plumbing and drain permits that repeat the word were excluded so a project is not counted twice.
  • Counting once. Each permit number was counted once, even when it has revisions. We used the earliest issue date among its records.
  • Excluded. Permits with no issue date, and permits whose every record has a status of Cancelled, Refusal Notice or Abandoned.
  • Period. Permits first issued from January 1, 2017 to December 31, 2025. 2026 is left out because the year is incomplete.
  • Dwelling units. A permit “creates a dwelling unit” when its DWELLING_UNITS_CREATED field is 1 or more. “Mentions an addition or a storey” means the description contains the word addition or storey.
  • Postal areas. The first three characters of the POSTAL field.
  • Checks. Every number was calculated twice with separate code, and both calculations matched exactly.
  • Limits. The description is free text typed by applicants and City staff, so permits that do not say “underpinning” are missed, and some that do may involve only a small part of the work. The data counts permits issued, not work finished or whether it passed inspection. Records change as the City updates them, so a download on another day can differ slightly.

Contains information licensed under the Open Government Licence (Toronto).

When you are ready to plan, call us to talk through feasibility for your house, starting from our basement underpinning service page.

Frequently asked questions

How many basement underpinning permits did Toronto issue from 2017 to 2025?

Our analysis of City of Toronto building permit data found 1,527 building permits issued between 2017 and 2025 whose description mentions underpinning. The yearly count rose from 128 in 2017 to 267 in 2025. These are permits the City issued, not completed projects.

Does every basement lowering project appear in this count?

No. We counted only building permits whose written description contains the word underpinning. A project described as lowering a basement floor or adding a bench footing without that word would not appear, and neither would work done without a permit.

Does Toronto require a building permit for underpinning?

Yes. The City of Toronto's residential underpinning guide says underpinning an existing house foundation needs a building permit. The guide also lists drawings, numbered construction stages and, in defined cases, a Professional Engineer's design and on-site review.

Why are more underpinning permits also creating dwelling units?

The data does not say why. It shows that permits creating at least one dwelling unit rose from 5 in 2017 to 43 in 2025, which fits a growing share of owners lowering a basement as part of a second unit. Only the permit file for a specific property shows its real purpose.

Can I use this data to predict whether my own permit will be approved?

No. The data counts permits that were issued and says nothing about how long they took or how many applications were refused or revised. Your lot, foundation and neighbours decide your path, so start with a feasibility review of the actual house.

Book a consultation for your project

Tell us about the space, the scope, and your timeline. Our design team reviews it and replies with the next step.

Free, no-obligation consultation and site visit with our design team.

or
Call (416) 524-1165

← All renovation guides

Call now (416) 524-1165 Book a Consultation