Do I need a building permit in Toronto?
Choose your project, answer a few short questions, and see whether a permit is needed, usually not needed, or depends. Every answer shows the reason and links to the official source.
Last checked 2026-11-08 against the City of Toronto and Ontario Building Code pages linked in each result. The City of Toronto, through Toronto Building, makes the final decision on whether your project needs a permit. This tool is general information, not legal or professional advice. Rules can change, so confirm with the City before you start work.
Related tools: permit review time calculator and all free tools.
We handle the permit drawings and the application for your renovation
Our design team prepares the drawings, manages the permit application and approvals, and builds the project, with one point of contact from start to finish.
Frequently asked questions
Do I need a building permit to finish my basement in Toronto?
Not always. The City of Toronto says finishing a house basement does not need a permit when there are no structural or material alterations, no additional dwelling unit and no new plumbing. A permit is required when the work includes structural or material alterations, heating or plumbing changes, excavation or foundation work, underpinning, a new basement entrance or a second suite.
How high can a deck be before it needs a permit?
Toronto lists an open, unroofed deck or platform as exempt when the finished deck level is not more than 60 cm (24 inches) above the adjacent finished grade, it is not part of a required exit and it meets the Zoning Bylaw. Constructing a deck more than 60 cm above ground needs a permit. The City also routes decks attached to an existing house through its Express permit process.
Does a backyard shed need a permit?
Under Division C, Sentence 1.3.1.1.(6) of the Ontario Building Code, a shed is exempt from the permit requirement when it is not more than 15 m2 (161 sq ft) in gross area, not more than one storey, not attached to a building or any other structure, used only for storage ancillary to the main building, and has no plumbing. The City of Toronto states the same 15 m2 threshold.
Do I need a permit to replace windows or doors?
Replacing a window or door in an existing opening of a detached, semi-detached or row house does not need a permit when the opening location and size do not change, the structural support is not affected and no new exit is created. New windows or doors, and enlarged or relocated openings, are structural or material alterations and need a permit.
Do I need a permit for a fence in Toronto?
Ordinary yard fences are regulated by the City of Toronto Municipal Code, Chapter 447 (Fences), which sets maximum heights, rather than by a building permit. Chapter 447 requires a permit for swimming pool enclosures. A fence that exceeds the height limits can be considered by Council for a site-specific exemption.
If no permit is needed, can I build anything I like?
No. The City states that projects that do not need a building permit must still comply with the Zoning Bylaw, and all work must meet the Ontario Building Code. The final decision on whether your project needs a permit rests with Toronto Building.
Cite this tool
Link to this checker from your own page by copying the HTML below.