Multiplex Conversion Permits in Toronto, 2017 to 2025

Our analysis of City of Toronto permit data finds 825 building permits naming a duplex, triplex or multiplex from 2017 to 2025, and 1,719 new dwelling units.

Our analysis of City of Toronto building permit data shows 825 building permits that name a duplex, triplex, fourplex or multiplex were issued from 2017 to 2025, and they created 1,719 dwelling units. Three quarters of them, 616, were issued in just the last two years, 2024 and 2025.

For a homeowner thinking about a multiplex conversion, the message is that the path is now well used across Toronto. The numbers do not say your house is suited to it. This post covers what the permit records show, how we counted, and what to take from them before you plan.

How many multiplex permits does Toronto issue each year?

The yearly count stayed between 15 and 55 until 2023, then jumped to 274 in 2024 and 342 in 2025. The 2025 count is 22.8 times the 15 permits issued in 2017.

Building permits naming a duplex, triplex, fourplex or multiplex, issued in Toronto by year, 2017 to 2025. Source: our analysis of City of Toronto building permit data (active and cleared permits), downloaded November 3, 2026.
Year issuedAll permitsWork on existing buildingsNew buildingsDwelling units created
20171510516
201826151129
20192418626
20202012837
20212721625
20224233948
202355411488
202427418688596
2025342199143854
Total8255352901,719

Put another way, 2024 and 2025 together hold 616 of the 825 permits, or 74.7 per cent, while the seven years from 2017 to 2023 hold the other 209. A homeowner planning today is working in a very different permit environment from one planning in 2020,, although the data cannot show whether reviews are faster or slower.

The step change between 2023 and 2024 is the finding that matters. We cannot say from permit records what drove it, so we do not guess. Part of it may be how applicants word their descriptions, a limit we return to below.

Are multiplex permits mostly for renovating existing houses?

Yes, mostly. Of the 825 permits, 535 (64.8 per cent) were for work on existing buildings, such as interior alterations, additions and combined projects, and 290 (35.2 per cent) were for new buildings. The new-building count rose from 14 in 2023 to 143 in 2025.

For an owner, that means two routes are active at once: converting what stands and replacing it. Converting often involves structural work to open floors, add exits and sometimes lower the basement, which is where our structural renovations and basement underpinning services come in. Our post on underpinning permits in Toronto shows how often that step accompanies a bigger plan.

How many units does a multiplex permit add?

Most permits add between one and four units. Of the 825 permits, 708 create at least one dwelling unit and 117 (14.2 per cent) create none. Among the 708, 228 add one unit, 164 add two, 117 add three and 188 add four. Together they created 1,719 units.

  • One unit: 228 permits, the most common result, such as a second suite.
  • Two units: 164 permits.
  • Three units: 117 permits.
  • Four units: 188 permits, the second most common result.

Only 11 permits created five or six units. The City says four-unit multiplexes are permitted city-wide, while six-unit permissions currently vary depending on location. If a suite in the basement is your goal, see our guide to legal basement apartments, and for a separate building in the yard, garden suites.

Where in Toronto are multiplex permits concentrated?

They appear in 82 three-character postal areas, but they cluster. The ten busiest postal areas account for 339 of the 825 permits, or 41.1 per cent. The top three are M6E with 55 permits, M6H with 49 and M6G with 37.

We report the clustering and stop there: the data does not tell us why, and a busy postal area is not a signal for or against your own house. A foundation, a lot width and a set of services decide what is practical, not a postal code. If your area is not on the list, that is no warning sign, and if it is, that is no promise.

What does the data mean for your own project?

  • Permission is a different question from feasibility. The City says you still need building permits and must meet zoning rules and comply with all City by-laws. Permit counts do not replace that check.
  • Scope decides the work. A permit that adds one unit and a permit that adds four are different projects, with different fire separations, services and structure.
  • Plan the house, not only the units. Many of these permits are part of a larger plan, so decide the whole scope before you draw one part. Our home additions page explains how added space and added units fit together.

What should you have ready before calling a contractor?

  • The house type (detached, semi-detached or row) and which walls are shared.
  • How many units you want and whether you plan to live in one.
  • Any earlier drawings, survey, permit history or notes about past water in the basement.
  • Whether you are open to an addition or a lowered basement to make the units work.
  • A realistic window for living elsewhere during the work.

Bring those and we will walk you through how structure, services and layout fit together on your property.

How we counted

We used two City of Toronto data sets published by Toronto Building: Building Permits - Cleared Permits and Building Permits - Active Permits. We downloaded both on November 3, 2026 and combined them.

  • Which permits. Permits whose written description contains the word duplex, triplex, fourplex, four-plex, multiplex, multi-plex, 3-plex or 4-plex, and whose permit number ends in BLD, the main building permit. Companion plumbing, mechanical and drain permits were excluded so a project is not counted twice.
  • Counting once. Each permit number was counted once, even when it has revisions, using the earliest issue date among its records.
  • Excluded. Permits with no issue date, and permits whose every record has a status of Cancelled, Refusal Notice, Refused, Abandoned or Application Withdrawn.
  • Period. Permits first issued from January 1, 2017 to December 31, 2025. 2026 is left out because the year is incomplete.
  • New buildings and existing buildings. We grouped by the permit type: New Houses and New Building are new buildings, and all other permit types are work on existing buildings.
  • Dwelling units. The highest value of the DWELLING_UNITS_CREATED field across a permit's records. A permit "creates" units when that value is 1 or more.
  • Postal areas. The first three characters of the POSTAL field.
  • Checks. Every headline number was calculated twice with separate code, and both calculations matched exactly.
  • Limits. The description is free text, so permits that do not use these words are missed, and wording habits may have changed over the years. The data counts permits issued, not work finished or approved at inspection. Records change as the City updates them, so a download on another day can differ slightly.

Contains information licensed under the Open Government Licence (Toronto).

When you are ready to plan, call us to talk through feasibility for your house, starting from our multiplex conversions service page.

Frequently asked questions

How many multiplex permits did Toronto issue from 2017 to 2025?

Our analysis of City of Toronto building permit data found 825 building permits issued between 2017 and 2025 whose description names a duplex, triplex, fourplex or multiplex. Of those, 616 were issued in 2024 and 2025. These are permits the City issued, not finished buildings.

Does a multiplex conversion need a building permit in Toronto?

Yes. The City of Toronto says that even where multiplexes are allowed by zoning, you still need building permits and must meet zoning rules and comply with all City by-laws. Zoning permission and a building permit are two separate approvals.

How many units can I add to a house in Toronto?

The City says four-unit multiplexes are permitted city-wide. Six-unit permissions currently vary depending on location, and they apply in the Toronto and East York District and Ward 23. Check the City's multiplex page and your property's zoning before you plan.

Are most multiplex permits for renovating an existing house?

Mostly. Our analysis found 535 of the 825 permits, or 64.8 per cent, were for work on existing buildings, and 290 were for new buildings. Both kinds rose sharply in 2024 and 2025, so building new and converting are both active paths.

Can this data tell me whether my house can become a multiplex?

No. Permit data shows what the City issued across the city and says nothing about your lot, your foundation or your wiring. A feasibility review of the actual house is what answers that question.

Book a consultation for your project

Tell us about the space, the scope, and your timeline. Our design team reviews it and replies with the next step.