Second Unit and Addition Permits in Mississauga, 2018 to 2025
Our analysis of City of Mississauga permit data finds 4,233 second unit and additional unit permits from 2018 to 2025, and shows which wards build them.
Our analysis of City of Mississauga building permit data shows 4,233 permits for second units and additional residential units were issued from 2018 to 2025, almost one in four of all residential permits. Annual counts rose from 213 in 2018 to a peak of 775 in 2024, and more than half of all of them were issued in just three of the city's eleven wards.
If you are weighing a basement apartment, a garage conversion or a garden suite on a Mississauga lot, the numbers say the City's permit desk handles these every working day. Below we show where they are built, how they compare with home additions, and the steps and City contacts to have ready. If you are planning one, our accessory dwelling unit work in Mississauga starts with the same checks.
How many second unit permits does Mississauga issue each year?
Mississauga issued 631 to 775 of these permits a year in 2023, 2024 and 2025, up from 213 in 2018. The 2025 count is 2.96 times the 2018 count, though it is 18.6 per cent below the 2024 peak.
| Year issued | Permits | Change from the year before |
|---|---|---|
| 2018 | 213 | First year in the data |
| 2019 | 300 | up 40.8 per cent |
| 2020 | 435 | up 45.0 per cent |
| 2021 | 509 | up 17.0 per cent |
| 2022 | 649 | up 27.5 per cent |
| 2023 | 721 | up 11.1 per cent |
| 2024 | 775 | up 7.5 per cent |
| 2025 | 631 | down 18.6 per cent |
| Total | 4,233 | 2.96 times the 2018 count by 2025 |
The City's data labels these permits "second unit" through 2022 and "additional residential units" from 2023, with a small overlap in 2023 and 2024. We counted both labels together. The 4,233 permits are 24.3 per cent of the 17,413 residential permits issued over the same eight years.
Which Mississauga wards build the most second units?
Ward 10 leads with 899 permits, ahead of Ward 11 with 696 and Ward 6 with 686. Together those three wards hold 2,281 of the 4,233 permits, or 53.9 per cent.
Home additions tell a different story. We counted additions and addition-and-alteration permits on detached, semi-detached and row dwellings, and they cluster in Wards 1 and 2, which together hold 568 of the 1,329 permits, or 42.7 per cent. Ward 10, first for second units, has only 46 additions.
| Ward | Second and additional unit permits | Home addition permits |
|---|---|---|
| 1 | 133 | 300 |
| 2 | 141 | 268 |
| 3 | 106 | 82 |
| 4 | 230 | 54 |
| 5 | 527 | 83 |
| 6 | 686 | 94 |
| 7 | 191 | 109 |
| 8 | 299 | 119 |
| 9 | 325 | 63 |
| 10 | 899 | 46 |
| 11 | 696 | 111 |
| Total | 4,233 | 1,329 |
Permits count what the City issued, not what each ward needs, and wards differ in size and housing stock. Read the table as a picture of where owners are choosing to add a unit inside the home, and where they are building out or up.
What does that mean for your Mississauga project?
It means a second unit is a routine permit file in Mississauga, so the deciding questions are about your house, not about whether the City will look at it. A basement apartment depends on ceiling height, egress, fire separation and the foundation. When the ceiling is too low, lowering the floor is the usual route, which is why we also look at basement underpinning in Mississauga. In the same data, 83 residential permits issued from 2018 to 2025 mention underpinning in their description.
For more space above ground, the home additions we build in Mississauga and second-storey additions in Mississauga follow a separate and longer path, because zoning limits on size and setbacks can send a design to the Committee of Adjustment for a minor variance.
What does the City of Mississauga say you must do?
Mississauga's own pages set out the rules in four places. We summarise them here so you can check each against the source.
- Units allowed: the City says owners of a detached, semi-detached or town home can build up to two additional residential units, and only one garden suite is permitted on a single lot. A fourplex is a separate option.
- Permit required: the City lists additions, underpinning foundation walls, finishing a basement to create rooms or living space, interior alterations and a change of use as work that needs a building permit. A deck under 600 mm (2 feet) high does not, though zoning rules still apply.
- Servicing and access: for a garden suite, water and wastewater can share the main home's connections or be separate through the Region of Peel, and the fire access path must be at least 1.2 metres wide and 2.1 metres high, no more than 45 metres from the street edge to the front door. Electrical and gas work follows Electrical Safety Authority and Technical Standards and Safety Authority guidelines.
- Heritage and variances: designated or listed heritage properties may need Heritage Advisory Committee review before the permit is submitted, and zoning non-compliance may need a minor variance.
How long does a Mississauga permit take?
The City's published time frames are a first review in 15 business days for a second unit, with an average total of 10 weeks. Residential alterations on detached and semi-detached homes average 7 weeks and new residential averages 13 weeks.
| Stage or project | Time |
|---|---|
| Prescreen | About 7 to 10 business days |
| First department review, residential | 10 business days |
| First department review, second unit | 15 business days |
| Average total, residential alteration (detached, semi) | 7 weeks |
| Average total, second unit | 10 weeks |
| Average total, new residential (detached, semi) | 13 weeks |
The City says these apply once an application is complete, and that each resubmission can add two weeks or more. A complete first submission is the single biggest thing you control.
What should you have ready before you call?
Gather these before a design meeting or a call to the City on 311:
- Your property's zoning, checked on the City's property information tool, and any heritage designation.
- A decision on the number and type of units: basement, garage conversion, rear or side addition or garden suite.
- A site plan, design drawings and forms, which the City asks you to submit online through its ePlans system.
- For an existing unit, proof of ownership (tax bill, title or assessment notice) and the signed-off permit, which are what the City's second unit registration asks for. Registration is emailed to [email protected] and the City says it carries no fee.
- A note of any ceiling height, structural or servicing questions about the house, since these drive design and cost more than the unit size.
Fees and cost depend on unit size and type, and some charges differ for the second and third unit, so ask for a figure based on your plans rather than a rule of thumb. For the wider rules on legal units across the region, see our guide to legal basement apartments in the GTA.
How we counted
We downloaded the City of Mississauga Issued Building Permits data set on November 6, 2026 (35,390 rows, 35,389 distinct permit numbers; the one repeated number was counted once). We kept residential permits with an issue date from January 1, 2018 to December 31, 2025, and excluded revoked permits and 2026, which is not a complete year. That left 17,413 permits.
Second units and additional residential units are permits whose application detail reads "second unit" or "additional residential units". Home additions are permits whose scope reads "addition to existing building" or "addition and alteration" on detached, semi-detached, row or condominium row dwellings. The underpinning count is permits whose description contains the word underpinning. We counted every figure twice, once by looping over the rows in Python and once with a separate database query, and the results matched exactly. Wards are the City's 11 wards as recorded in the data. We used no addresses, names, permit numbers or cost fields.
Limits: the data show permits issued, not finished units or occupied apartments, and the description text is entered by City staff, so a few permits may be missed or misfiled. This is our analysis of the data, not a City report.
Mississauga publishes this data set under its open data terms of use.
Thinking about a unit or addition in Mississauga? See our accessory dwelling unit service in Mississauga, or our wider legal basement apartment service.
Frequently asked questions
Do I need a building permit for a basement apartment in Mississauga?
Yes. The City of Mississauga says you need a building permit to build new units on your property, and it lists finishing a basement to create rooms or living space as work that needs a permit. Registration of an existing second unit also asks for a copy of the permit signed off by all City inspectors.
How many additional units can I build on a Mississauga lot?
The City says owners of a detached, semi-detached or town home can build up to two additional residential units, or a fourplex. Only one of the two can be a garden suite. Your zoning and lot decide what is actually possible, so check the property first.
How long does a Mississauga second unit permit take?
The City publishes a first review time of 15 business days for a second unit and an average total of 10 weeks, counted from a complete application. Incomplete applications and resubmissions are not covered by those timelines and can add two weeks or more per cycle.
Is registering a second unit in Mississauga free?
The City says there is no fee to register a second unit. You email proof of ownership, the signed-off building permit and the registration form to the City, and the unit is added to its public Second Units Registry List. You may still pay for the permit, inspections and design work.
Where in Mississauga are the most second unit permits issued?
In our analysis of the City's permit data, Ward 10 had the most second unit and additional unit permits from 2018 to 2025 with 899, followed by Ward 11 with 696 and Ward 6 with 686. The three together account for 53.9 per cent of the 4,233 permits.
Book a consultation for your project
Tell us about the space, the scope, and your timeline. Our design team reviews it and replies with the next step.